St Helens Borough Local Cycling and Walking Infrastructure Plan (LCWIP)

When will the infrastructure be delivered?

The St Helens Borough Council LCWIP (PDF, 14 MB) sets out timescales for the rollout of priority schemes in the short term (2023-2026), medium term (2026-2029) and long term (2029+).

Schemes were ranked based on numerous metrics which align with the LCWIP objectives. They were then assigned a proposed delivery timescale based on their score, accounting for deliverability constraints.

The delivery timescales of the proposed interventions are shown on the maps below (click to enlarge).

Proposed Timescales for the LCWIP Cycling Schemes
Proposed timescales for the LCWIP cycling schemes

Proposed Timescales for the St Helens Town Centre Walking Schemes
Proposed timescales for the St Helens Town Centre walking schemes

Proposed Timescales for Earlestown Town Centre Walking Schemes
Proposed timescales for the Earlestown Town Centre walking schemes

Proposed Timescales for Haydock Industrial Estate Walking Schemes
Proposed timescales for the Haydock Industrial Estate walking schemes


Full details of the prioritisation process and the schemes shown are available in the St Helens Borough LCWIP (PDF, 14 MB)


 